Durham Region News
Search

Beaver River Bridge Replacement update July 19, 2024
Posted on Monday, July 22, 2024 09:35 AM
The Region of Durham is currently designing temporary and permanent replacements of the Beaver River Bridge, located on Regional Road 15 east of Highway 12, in the Township of Brock. The existing bridge will be replaced with a new structure and is scheduled to commence construction in 2026 and be completed in 2027. In the interim, a temporary bridge is tentatively scheduled to be opened to traffic in the fall of 2024.
Both the temporary and permanent bridges are in the design stage.
The Region's...

New Virtual Home Energy Assessment Tool launches in Durham Region
Posted on Wednesday, July 17, 2024 09:30 AM
Whitby, Ontario – Today, the powerful new Virtual Home Energy Assessment Tool (vHEAT) is launching in Durham Region as part of the Durham Greener Homes Program. Using artificial intelligence (AI), vHEAT produces a digital energy score to help users understand how much energy their home consumes compared to homes of similar size, age, and type. The tool also provides each homeowner with a customized “retrofit road map” showing how they can reduce energy consumption, resulting in cost-savings.
Home...

Grow your Green Bin! New materials are now accepted
Posted on Friday, July 05, 2024 02:23 PM
Diapers, menstrual products, incontinence products, pet waste and pet litter can now be disposed of in the Green Bin for weekly curbside collection.
The revised program is designed to maximize waste diversion, minimize the waste being processed at the Durham York Energy Centre, increase convenience, and achieve compliance with Ontario’s Food and Organic Waste Policy Statement.
A limited number of additional Green Bins will be available for residents to purchase, to a maximum of one per household,...

Upcoming lane restrictions on Osborne Street in Beaverton
Posted on Thursday, July 04, 2024 02:38 PM
Whitby, Ontario – The Regional Municipality of Durham is advising residents of upcoming lane restrictions on Osborne Street in the community of Beaverton in the Township of Brock.
Where: Osborne Street at the intersection of Bay Street, in Beaverton.
When: July 8 to July 12. Unfavorable weather conditions may impact the work schedule.
Why: To safely install watermain infrastructure as part of the Beaverton Watermain Replacement project. To learn more about the project, visit durham...

Lane Restrictions Osborne Street at Bay Street, Beaverton
Posted on Wednesday, June 26, 2024 01:42 PM
Watermain replacement on Simcoe Street (Regional Road 15), Bay Street, Mill Street, and Church Street in Beaverton in the Township of Brock
As previously notified, the Regional Municipality of Durham has awarded the contract for watermain replacement on Simcoe Street (Regional Road 15), Bay Street, Mill Street and Church Street in Beaverton, in the Township of Brock.
CONSTRUCTION SCHEDULE
The Region’s contractor, Carchidi Excavating Ltd. is on-site and continuing the installation of watermain on...